Completed 2016 Meeting Document Submission Deadlines and Templates in MS Word Format
TG-1/2016 – Second-Generation Beacon Specifications
(4 – 8 April)
- 22 February: Bulky documents (over 10 pages)*
- 7 March: Working Paper
- 21 March: Response Paper
- 21 March: Information Paper
TG-2/2016 – MEOSAR Evolution
(20 – 24 June)
- 10 May: Bulky Papers (over 10 pages)*
- 24 May 31 May: Working Paper
- 6 June 14 June: Response Paper
- 6 June: Information Paper
JC-30 – 30th Meeting of the Joint Committee
(18 – 27 September)
- 1 March: 2015 Report on System Status and Operations
- 1 April: 2016 System Level Test Results
- 8 August: Bulky documents (over 10 pages)*
- 8 August: New System Documents (including commissioning reports and performance evaluation reports)
- 22 August: JC-30 Change Management (recommends changes to System technology, current operations or policies; resource estimate required)
-
As outlined in section 6.5 of document C/S P.011, the change management template is to be used for input documents proposing “changes which have a significant, cost effective impact” and contain a change or changes to “elements of the Ground Segment, Space Segment, beacon specifications or beacon type approval standards by participants to the Joint Committee (JC) or specifically
established Task Groups (TG).”
-
- 22 August: JC-30 Working Paper
- 6 September: JC-30 Response Paper
- 6 September: JC-30 Information Paper (no recommended actions)
- 6 September: Revisions and addenda to timely submitted papers (with changes tracked in strikethrough, italics and left track bar)
- Splinter Group Report Template